Andrie successfully bid on a long-term contract to design, construct, own, and operate a 50,000 barrel tank barge and tug for BP. The ATB was delivered to BP service in 2009.
Andrie successfully bid on a long-term contract to design, construct, own, and operate a 50,000 barrel tank barge and tug for BP. The ATB was delivered to BP service in 2009.